Tuesday 5 September 2017

Day 23 of 266

I popped in to our construction this morning after a rainy night to see if there are any uneven areas where water would be pooling.

From what I've seen, our slab levelling has been done very well and only the living area has a small amount of water left over from rain. I told our site supervisor about this and he said that it will be inspected and fixed later if there are any issues. Darbecca will also do a proper inspection for us. Hopefully, this would minimise our cost when we do our own flooring after hand-over.



Now, the hole that I mentioned in my previous post is not a damage and is meant for a toilet fixture as confirmed by our base supervisor and site supervisor.




No comments:

Post a Comment