Tuesday 24 October 2017

Day 68 of 266

Electrical wiring was completed today and we also got the flooring for our shower areas. The installer from Big Picture People came over today to install our home theatre wire, but they were worried that someone will steal their cable with other sparkies around so they said they will just come back on Tuesday.

I had a meeting with my site supervisor yesterday and mainly discussed and inspected our concern with the slab, alfresco sliding door and main entry door step. I sent him an email to formally request for our slab to be inspected by their engineering, the door step and the sliding door to be replaced.

We also found out that we have capped hot and cold water and capped waste point installed in our alfresco area worth $464 for free. We initially requested our sales consultant to include this in our quote and  when we had our structural variation meeting with him, he also included their locations in our drawing. During our tender appointment, we asked the presenter to remove this when our cost became too much. Turns out that he just removed them from the cost, but not from the drawing. and so it got included in the building

The living/dining area with provision for fireplace
   
The kitchen and family room

The alfresco door that fell and sustained scratches. Our SS said that if the door was scratched and dented, he will replace this door later. 


The dent in the other alfresco door. Our SS said that he can have these parts replaced.

The shower flooring in the bathroom

Our master ensuite shower flooring

Our master bedroom and the view

The main entry door step with crack


Parts of our slab with bony finish to the edge, as Darbecca suggested we are requesting PD to have this review by their engineering. Our SS was agreeable to this and he will send us a report from their engineering.







No comments:

Post a Comment